From treatment and rehabilitation of our nation’s wounded warriors to medical care for the president and assorted dignitaries, Walter Reed National Military Medical Center is an essential facility where critical electrical power should never fail. And that’s where the Cynergy Electric and Curtis Power Solutions team has made a difference…
Well-known electrical contractor Cynergy Electric provided the backbone of the emergency power center in this project. Cynergy also teamed with Curtis Power Solutions to provide a full emergency backup power system for the main hospital building as a part of a monumental seven-year Medical Center Addition/Alteration Project dubbed P-114.
According to Cynergy Electric’s Vice President and Principal Charlie Bonuccelli, “This project was completed in phases to allow the hospital to remain fully operational during construction. There were a number of challenges in our team’s portion of Phase 3. These complexities were effectively overcome through creative engineering and outstanding teamwork with Curtis Power Solutions.”
The emergency backup power solution for the Walter Reed National Military Medical Center, devised by Curtis Power Solutions in partnership with Cynergy Electric, includes two mtu 1500 kW generators.
Challenges and Solutions
Putting a square peg in a round hole
This addition/alteration project at Walter Reed is vast in scope and has often required creativity in converting existing structures to meet the needs of expansion and modernization. An example of this was repurposing part of an existing low-ceiling parking garage to contain two large state-of-the art backup generators to serve the main hospital.
How did they do it?
Another challenge was fitting the exhaust system into the compressed space. There was insufficient height for a standard muffler system to maintain the desired sound attenuation/noise level, without blocking air flow and causing back pressure issues for the generator engines.